Shift-Change Shuttles for Industrial Sites: Timing, Queues and Safe Loading

By Shelly

Interest declared: I write for Golf Cart Distributor, a supplier of electric shuttles and carts. The method here is queueing arithmetic you can run with a spreadsheet, not a description of any specific operation.

On an industrial campus, port, plant or logistics park, the busiest moment of the day is shift change. Two hundred people leave at 14:00 and two hundred arrive. If the car park is a ten-minute walk from the gate, a shuttle loop decides whether the first twenty minutes of the shift are productive or lost.

Measure the real demand

Count people at the stops for three shift changes, in five-minute buckets. You are looking for the shape: usually a sharp peak of ten to fifteen minutes. Record how many arrive by each stop and how many walk anyway. Surveys reveal that many workers will walk up to four or five minutes before they wait for a vehicle.

Work out the loop

Measure the route in metres, including every stop. At 10 to 15 km/h on a site with pedestrians, a vehicle covers roughly 170 to 250 metres a minute. Add a dwell of 45 to 90 seconds at each stop. A 1.2 km loop with three stops might take eight to ten minutes.

Capacity during the peak

Capacity per vehicle per loop is seat count, plus standing places if the vehicle and your rules allow them. Assume 80 percent fill at peak. For a 14-seat vehicle, that is 11 people per loop. If 200 people must move within 15 minutes and a loop takes 9 minutes, each vehicle manages about 1.7 loops in the window, so about 19 people. You would need around ten vehicles, which is not realistic. The answer is to spread the peak, not buy more vehicles:

Queue design

Mark a stop with a clear boundary, floor markings and a line so that passengers do not crowd the lane. If the stop is a kerb, provide a barrier or bollards so the queue does not drift into the path. Use a shelter with roof and seats if waits can exceed three minutes.

Loading safely

At shift change people are tired or in a hurry. Rules that help:

Vehicle choice

Open-sided shuttles load quickly, while enclosed ones protect from rain, heat and dust. On a site where the air is dirty, enclosed bodies may be more comfortable. Seat counts of 14 to 27 handle peaks better than small carts, but need wider paths and turning space; check the outer turning radius on the sheet.

Charging and spare capacity

A shuttle that runs all day needs a defined charging window. If shifts run around the clock, plan for a second set of vehicles or a rotation with opportunity charging. Keep a spare vehicle in reserve and record battery readings at each handover.

Measure the result

After a month, check how long people wait at peak, how many board each trip, and how often vehicles run empty. Adjust the loop and the start times, then repeat.

Further reading

The supplier's campus and industrial application page describes fixed-route people movement and back-of-house logistics, and the shuttle bus range lists seat counts from 8 to 27.